IT equipment integration
IT equipment integration
  • Preliminary installation in our workshops
  • Assembly prior to installation
  • Product mastering
  • Pre-installation configuration
  • Commencement of operation
  • Connection to clients’ networks
  • Function tests
  • Demonstration and user training
  • Availability of 1st, 2nd and 3rd level technicians
IT equipment integration – MFP installation – mastering Connection / disconnection of IT systems
H.D.Clic création site internet référencement de site